HOERBIGER Drive Technology (Changzhou) Co., Ltd.




Location              Changzhou, Jiangsu

Time                     2009-2010/2011/2015-2016 in 3 phases

Area                     55,000 m2* / 8,000 m2 / 25,000 m2

 

 

Scope

Concept design, detail design, tendering, site management, documentation